Technology NewsTechnology NewsTechnology News
  • Computing
  • AI
  • Robotics
  • Cybersecurity
  • Electric Vehicle
  • Wearables
  • Gaming
  • Space
Reading: DEWALT and August Robotics Speed Up Data Center Construction with Robots
Share
Font ResizerAa
Technology NewsTechnology News
Font ResizerAa
Search
  • Computing
  • AI
  • Robotics
  • Cybersecurity
  • Electric Vehicle
  • Wearables
  • Gaming
  • Space
Follow US
  • Cookie Policy (EU)
  • Contact
  • About
© 2025 NEWSLINKER - Powered by LK SOFTWARE
Robotics

DEWALT and August Robotics Speed Up Data Center Construction with Robots

Highlights

  • DEWALT and August Robotics launched a robotic drilling system for data centers.

  • The robots can cut floor drilling timelines from weeks to days.

  • The solution is expected to be commercially available by mid-2026.

Samantha Reed
Last updated: 29 January, 2026 - 4:50 pm 4:50 pm
Samantha Reed 3 weeks ago
Share
SHARE

Contents
How Does the Robotic Drilling System Work?What Benefits Do Users Gain?When Will This Be Widely Available?

Bringing automation directly to construction sites, DEWALT and August Robotics have introduced an autonomous system aimed at changing how concrete floor drilling is carried out for data centers. This solution integrates a DEWALT industrial drilling rig with the Lionel autonomous mobile robot platform developed by August Robotics, focusing on boosting efficiency for large-scale data center developments. Contractors and project managers increasingly look for ways to manage time and cost constraints as global demand for data centers rises, and this robotics collaboration looks set to reshape workflows by reducing the time required for labor-intensive drilling tasks.

In earlier reports about the Lionel robot, its main use involved marking exhibition floors and providing industrial layouts with high precision. Coverage previously did not mention the addition of drilling tasks, focusing instead on layout marking and the robot’s accuracy in marking positions. Now, the integration of DEWALT’s drilling capability marks a shift from marking to active drilling, addressing a broader segment of construction needs. The initial market rollout was limited to exhibition setups, whereas the current joint system aims at commercial-scale data center floor preparations, reflecting an expanded vision and new industry applications.

How Does the Robotic Drilling System Work?

The solution leverages building CAD plan data, enabling the robots to autonomously identify and drill holes with an accuracy margin close to 1/8 inch. Lionel’s localization expertise pairs with DEWALT’s industrial hardware, ensuring each hole meets the strict requirements necessary for bolting server racks to concrete slabs. The combined platform aims to cut down what would usually be eight or nine weeks of manual layout and drilling into just over a week if multiple robots are deployed.

What Benefits Do Users Gain?

Developers using this new system see several advantages. These include improved worksite safety, significant decreases in worker fatigue, and major time savings. High placement accuracy also makes this solution appealing for environments where error margins are minimal. One company representative stated,

“With the early access program, 12 robots are currently in the field, having drilled 108,000 holes with 99.97% placement accuracy,”

highlighting both the technology’s impact and its current operational reach.

When Will This Be Widely Available?

DEWALT’s current go-to-market plans for the robotic drilling system remain in a piloting phase, with further commercialization planned around mid-2026. The companies are collaborating on a market rollout strategy, leveraging their respective partner networks to scale up deployment. As the solution was recently demonstrated at a major construction trade show, interest is increasing. “It’s got the technology to make sure it’s not going to run into anything — it comes from multiple angles if something is blocked, to try to get it from different angles,”

“Whether it’s a new build, it’s a warehouse, it’s a data center, any building that’s got a concrete floor, an open area to drill, it’s going to work very well in.”

By targeting the specific pain point of hole drilling in concrete floors, DEWALT and August Robotics seek to optimize a repetitive task that traditionally requires significant time and skilled labor. The anticipated cost reduction—from over $60 per hole to about $20—illustrates the financial motivation for investing in such automation. For readers managing construction or data center projects, this automation could provide measurable improvements to timelines and workforce allocation. Understanding when and how these robotic platforms reach full commercial deployment will be key for stakeholders considering adopting advanced robotics solutions for high-volume and accuracy-critical construction projects.

You can follow us on Youtube, Telegram, Facebook, Linkedin, Twitter ( X ), Mastodon and Bluesky

You Might Also Like

Medtronic Receives FDA Clearance for Stealth AXiS Spine Surgery System

Manufacturers Boost Safety as Cobots Share Workspaces with Staff

NASA Collaborates With PickNik and Motiv to Advance On-Orbit Robotics

Apptronik Secures $520M to Boost Apollo Production and Deployment

Symbotic Boosts Logistics Portfolio with Fox Robotics Purchase

Share This Article
Facebook Twitter Copy Link Print
Samantha Reed
By Samantha Reed
Samantha Reed is a 40-year-old, New York-based technology and popular science editor with a degree in journalism. After beginning her career at various media outlets, her passion and area of expertise led her to a significant position at Newslinker. Specializing in tracking the latest developments in the world of technology and science, Samantha excels at presenting complex subjects in a clear and understandable manner to her readers. Through her work at Newslinker, she enlightens a knowledge-thirsty audience, highlighting the role of technology and science in our lives.
Previous Article North Korean Cyber Group Splits to Target Multiple Sectors
Next Article Tesla Pushes AI and Robotics as Margins Grow in Q4 2025

Stay Connected

6.2kLike
8kFollow
2.3kSubscribe
1.7kFollow

Latest News

Nigerian Man Faces Prison for Tax Fraud Targeting U.S. Agencies
Cybersecurity
Global Gamers Spend Less Time Playing as Competition Grows
Gaming
Saudi Giant Humain Backs xAI With $3 Billion Investment
AI Technology
Tesla Drivers Log 8 Billion Miles Using Full Self-Driving System
Electric Vehicle
Ottonomy Launches Ottumn.AI to Connect Robots, Drones, and Infrastructure
AI
NEWSLINKER – your premier source for the latest updates in ai, robotics, electric vehicle, gaming, and technology. We are dedicated to bringing you the most accurate, timely, and engaging content from across these dynamic industries. Join us on our journey of discovery and stay informed in this ever-evolving digital age.

ARTIFICAL INTELLIGENCE

  • Can Artificial Intelligence Achieve Consciousness?
  • What is Artificial Intelligence (AI)?
  • How does Artificial Intelligence Work?
  • Will AI Take Over the World?
  • What Is OpenAI?
  • What is Artifical General Intelligence?

ELECTRIC VEHICLE

  • What is Electric Vehicle in Simple Words?
  • How do Electric Cars Work?
  • What is the Advantage and Disadvantage of Electric Cars?
  • Is Electric Car the Future?

RESEARCH

  • Robotics Market Research & Report
  • Everything you need to know about IoT
  • What Is Wearable Technology?
  • What is FANUC Robotics?
  • What is Anthropic AI?
Technology NewsTechnology News
Follow US
About Us   -  Cookie Policy   -   Contact

© 2025 NEWSLINKER. Powered by LK SOFTWARE
Welcome Back!

Sign in to your account

Register Lost your password?